Theme

Subsurface

Drills, heat-flow probes, radar, ice mining, scoops - when listed on a flight.

Cargo

Lunar Dielectric Analyzer

Astronaut-deployed dielectric analyzer to map how lunar regolith carries an electric field - a path to polar volatiles and frost or ice.

Jobs

Chang'e-5 orbiter / service module

CAST service module (orbiter) provided lunar-orbit support, automated rendezvous/docking with ascender, sample canister handoff, and Earth-return trajectory.

LETS on IM-6 (CS-8)

NASA LETS Linear Energy Transfer Spectrometer on IM-6 / CS-8 Moon Base package (triad with SCALPSS + LRA on each CS-8 delivery).

SAMPLR robotic arm (Maxar)

Sample Acquisition, Morphology Filtering, and Probing of Lunar Regolith (SAMPLR) - Maxar Technologies robotic arm / sieve-scoop / penetrometer on Blue Ghost M3.

Flights

Chang'e-52020-11-23 · CNSA national lunar sample-return (near side).
Artemis I2022-11-16 · First integrated Artemis flight test: uncrewed SLS Block 1 + Orion.
Chandrayaan-32023-07-14 · ISRO national soft-landing mission near lunar south polar highlands.
Luna-252023-08-10 · Roscosmos national polar lander (Luna-25).
IM-1 Odysseus2024-02-15 · IM-1 Odysseus (TO2-IM): first commercial soft landing (Feb 2024).
Chang'e-62024-05-03 · CNSA national far-side lunar sample-return via Queqiao-2 relay.
Blue Ghost Mission 12025-01-15 · Firefly Blue Ghost Mission 1 (TO19D ~$93.3M): Falcon 9 launch 2025-01-15 · soft landing (upright) Mare Crisium 2025-03-02 · all 10 NASA.
IM-2 Athena2025-02-27 · IM-2 Athena (PRIME-1 path): south polar attempt (Mar 2025).
IM-3 TrinityNET H2 2026 · Intuitive Machines IM-3 (CLPS CP-11): Nova-C Trinity - NASA Moon Base III.
Chang'e-7NET August 2026 · CNSA south-pole complex (orbiter, lander, rover, hopper) focused on water-ice and polar environment.
IM-4NET ~2027 · Six NASA science payloads to Mons Mouton / south polar highlands.
Artemis IIINET 2027 · First crewed Artemis lunar landing architecture (SLS + Orion + HLS).
Starship Lunar Cargo (HLS path)NET late 2020s-2030s (HLS path) · SpaceX Starship lunar architecture: NASA HLS crew lander path (Option A/B) plus heavy cargo configurations.
Artemis IVNET 2028 · National crewed lunar landing architecture after Artemis III.
Blue Ghost Mission 4NET ~2029 · South-pole CLPS with multiple rovers (MoonRanger, CSA path) and instruments.
IM-5 Nova-DNET ~2030 class · First cargo-class Nova-D CLPS.

Companies