Job
Blue Ghost power / solar
Firefly vertical-integration claim for Blue Ghost power and solar resources supporting payload ops through lunar day.
Themes: Surface power · Landers · Power, structure & propulsion · Earth prep · AIT & integration
Flights
Blue Ghost Mission 12025-01-15 · Firefly Blue Ghost Mission 1 (TO19D ~$93.3M): Falcon 9 launch 2025-01-15 · soft landing (upright) Mare Crisium 2025-03-02 · all 10 NASA science/tech payloads.Blue Ghost Mission 2NET 2027 · Firefly Blue Ghost Mission 2 (CS-3 ~$112M, charter-bg2): planned far-side dual-stack (Blue Ghost stacked on Elytra Dark + ESA Lunar Pathfinder).Blue Ghost Mission 3NET ~2028 · Six NASA science payloads to Gruithuisen Domes.Blue Ghost Mission 5 (Moon Base CS-8)NET ~2028 (CS-8 Moon Base) · 2028 Moon Base batch Firefly delivery.Blue Ghost Mission 4NET ~2029 · South-pole CLPS with multiple rovers (MoonRanger, CSA path) and instruments.